Sunday, September 9, 2018

Interior Walls 13

Finished up two walls!

The north wall (with the exception of the small bathroom piece I'm still working on). I'm especially happy with the trim piece I installed around the vent for the air exchanger.


The east wall.



More progress in the bathroom.





Also see:
Interior Walls 1
Interior Walls 2
Interior Walls 3
Interior Walls 4
Interior Walls 5
Interior Walls 6
Interior Walls 7
Interior Walls 8
Interior Walls 9
Interior Walls 10
Interior Walls 11
Interior Walls 12
Interior Walls 14
Interior Walls 15


Georgie sound asleep...


...and only sort of asleep.


No comments:

Post a Comment