Wednesday, August 27, 2014

Dormer Wrap Up 1

I have been working on the finishing touches on the two dormers. I am installing nailer boards on the four diagonal rafters.


The top edges of the nailers are sloped at a different angle than the top edge of the diagonal rafters--to catch the edge of the roof sheathing I will install on the dormers.


My brother caught me up in the dormer rafters.


I am also installing blocking between the dormer rafters--before installing the plywood sheathing on the outside of the dormers.


The north dormer is now done!


Halfway through installing the blocks on the south dormer...


All the south dormer blocks are now done.