All of the vapor barrier and radiant barrier is completely done! Every joint/break/seam is taped.
I miscalculated how much radiant barrier I needed for this project--by a lot. I never even opened this last roll.
I continued to install boards in the corner of the closet...
...until I was done.
The view from the inside of the closet...
This next shot is looking straight down the outside wall of the closet. I placed a board on the outside there to show that there is a purposeful gap between the lower edge of each of those boards and the kitchen wall on the outside of the closet. The gaps should keep these boards from trapping a bunch of dirt at their bottom edges. Because...
...all of these boards are shelves for shoes!
After finishing the shoe shelves, I cleaned out the JayBee and vacuumed. From the bed alcove, looking toward the bathroom/west end...
From the bathroom looking toward the bed/east end...
The JayBee is now ready for ceiling and wall boards.
I can almost see a house there. ;)